Has anyone here ever used epoxy with silica sand to rejection as a base coat for a sub floor job instead of roofers felt, metal lathe and TP? If so please
explain the requirements for the sub floor as well as installation procedure of entire floor.
My customer has a 2400 SQ FT open concept wood floor he is willing to pay $8/sq ft. The desired finish is 48 inch white tiles with black grout line and semi gloss seal. I'm all for doing the job but not too excited about installing aprox 120 sheets of metal lathe.
Please help.
My customer has a 2400 SQ FT open concept wood floor he is willing to pay $8/sq ft. The desired finish is 48 inch white tiles with black grout line and semi gloss seal. I'm all for doing the job but not too excited about installing aprox 120 sheets of metal lathe.