We are concerned with the severe freeze thaw cycle that Oklahoma experiences. We can have 40 degree temps. and rising up to 65 even 70 degrees during the
day and that very night the temp will drop down below freezing. We feel that on these days the material has had ample time to dry, but not always. Should we
take the risk or just stick to the days where the weather is more consistent and does not freeze by night and thaw by day. If anyone has any advice on this
topic, it would be greatly appreciated.
We also are wondering what kind of warranties are being offered by other contractors. We want to offer a limmited warranty.
Also, we have several driveways that seem to be structurally sound but have consideralbe flaking and damage to the top. I would say some of them are almost 60
to 70% scaled off. Again, the structure seems to be stable ,it is the top that has gone bad. Should we resurface in this situation?

