Whatup ladies and gents
so im prepping my first bathroom job! got the colors and texture planned and ready. goin with 2 coats of tf, 2nd coat tuscan trowled. pcc's chocolate base, sandstone and desert beige mist. all ready to start the layers this monday, BUT...now the guy's wondering if he can lay some hot water heated pex piping over the top of his existing floor this weekend. i told him to consider electric but the guy is a hot water heat lover. wants to go with 3/8 to 1/2 pex pipe. told him the smallest he can go with that pipe is best. would i have to change my plans to a tp to add more clearence from the pipes, or would my original plan still work?
this n00b appr's any advice!
so im prepping my first bathroom job! got the colors and texture planned and ready. goin with 2 coats of tf, 2nd coat tuscan trowled. pcc's chocolate base, sandstone and desert beige mist. all ready to start the layers this monday, BUT...now the guy's wondering if he can lay some hot water heated pex piping over the top of his existing floor this weekend. i told him to consider electric but the guy is a hot water heat lover. wants to go with 3/8 to 1/2 pex pipe. told him the smallest he can go with that pipe is best. would i have to change my plans to a tp to add more clearence from the pipes, or would my original plan still work?
this n00b appr's any advice!


